McCube – Homes to Go
Home page · Technology · Production

Architecture under controlled conditions.

Digital planning and serial production combine speed with reproducible quality.

Architecture under controlled conditions.

mc cube in the film

Flexible homes to take with you.

The official explanation video shows how a clear system creates adaptable architecture for different phases of life.

Construction takes place before the construction site begins.

During prefabrication, construction, expansion, building technology and quality control are closely intertwined. As a result, a large part of the work is shifted from the weather to predictable production conditions.

01

Digitally prepared

Planning and interfaces are coordinated before production begins.

02

Worked in parallel

The foundation and development can be created at the same time as module production.

03

Shortly assembled

Prefabricated units are delivered, assembled and connected.

Serial precision

Repeatable work steps ensure reliable processes. At the same time, the project design remains decisive for the facade, materials, floor plan and furnishings.

QUBE X – the serial space product from mc cube

QUBE X transfers the experience of mc cube into a consistently standardized spatial product: digitally planned, controlled and scalable through identical units. <a href="https://qube-x.com/" target="_blank" rel="noopener">QUBE X discover ↗</a>

Logistics as a planning task

Transport dimensions, access, crane location and assembly sequence are checked early on. The path from the factory to the finished building becomes part of the design.

Next step

Visit our production.

Get in touch ↗