Digitally prepared
Planning and interfaces are coordinated before production begins.
Digital planning and serial production combine speed with reproducible quality.

mc cube in the film
The official explanation video shows how a clear system creates adaptable architecture for different phases of life.
During prefabrication, construction, expansion, building technology and quality control are closely intertwined. As a result, a large part of the work is shifted from the weather to predictable production conditions.
Planning and interfaces are coordinated before production begins.
The foundation and development can be created at the same time as module production.
Prefabricated units are delivered, assembled and connected.
Repeatable work steps ensure reliable processes. At the same time, the project design remains decisive for the facade, materials, floor plan and furnishings.
QUBE X transfers the experience of mc cube into a consistently standardized spatial product: digitally planned, controlled and scalable through identical units. <a href="https://qube-x.com/" target="_blank" rel="noopener">QUBE X discover ↗</a>
Transport dimensions, access, crane location and assembly sequence are checked early on. The path from the factory to the finished building becomes part of the design.